久久99久久99精品免观看,97视频免费看,97成人免费视频,亚洲综合丁香,第一福利视频网,视频福利网站,福利视频精品

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
Inspection and maintenance operations before and after the loader
Public date:2015-1-21   Hits:14113

Daily inspection and maintenance of pre-and post-job

Engine, electrical, instrumentation section

1.Check the water level in the tank。
2.Check the fuel oil tank。
3.Check the engine oil sump capacity。
4.Tightness check the tubing, pipes, pipe and various parts of the。
5.Check the battery terminal。

Chassis part

1.Check the hydraulic fluid amount of work。
2.Check the tightness of the hydraulic system piping and accessories。
3.Check the foot brake, hand brake work is reliable。
4.Check the joystick in the neutral position is flexible and。
5.Check the tire pressure (front: 0.30 ~ 0.32MPa, rear: 0.28 ~ 0.30MPa) is normal, tire bolts are loose, the locking force: 830N.m. Tire pressure must be controlled within the specified range, otherwise it would cause a major accident, such as a flat tire, causing casualties and losses。
6.Check before connecting the rear propeller shaft bolt is loose, shedding phenomenon, locking force: 130 ~ 215N.m。
7.Check the pin connecting bolt is loose。

Bolt locking force (unlabeled bolt grade 4.8)


Thread diametermm

6

8

10
(8.8Level)

12
(8.8Level)

14

16
(8.8Level)

18

20

22

24

27

30

36

TorqueN.m

4

9.5

48

86

51

220

112

160

220

280

410

550

970

8.Check the water level, the gearbox oil level, hydraulic oil, brake fluid (brake fluid) oil level [regular maintenance according to section 3.3], check for oil spills, leaks, air leaks。
9.Each nozzle grease filling (once a day, at least 3 to 4 times per week)。

Start the engine

1.Check the meter indication is normal。
2.Check the lighting equipment, horn, wiper, brake lights work。
3.Check the operation of the working device manipulation case。
4.Whether listening to the low-speed operation of the engine is working properly。
5.Engagement stall run。

 


Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息
平利县| 西乌珠穆沁旗| 克什克腾旗| 屯昌县| 华池县| 株洲县| 商洛市| 团风县| 丹凤县| 将乐县| 金门县| 湖州市| 沙雅县| 彭泽县| 雷波县| 黄大仙区| 武平县| 桐城市| 泽州县| 信宜市| 昂仁县| 原阳县| 汽车| 隆尧县| 大新县| 察哈| 剑阁县| 南澳县| 永康市| 日土县| 通海县| 涟水县| 蒙城县| 托里县| 临沧市| 慈利县| 海原县| 华宁县| 磴口县| 彰化市| 皮山县|